- ID
- #101002930138
- Status
- CLOSED
- Opened
- Closed
- Description
- Last Fall the concrete sidewalk was remove due of trip hazard. it was replace with asphalt until the better weather in the spring or summer 2019. that will be filled back in with concrete. as of today 6/10/19. none has come by to do any work or survey the issue.
- Location
-
246 Hebron St, Mattapan, Ma, 02126
42.2714575, -71.1085281
Activity
-
Submitted
Opened
Closed
Case Noted | We have sent an engineer to evaluate and will take care of any immediate public safety hazards. Permanent restoration will be included in a future program when we address upgrades to the area sidewalks. Michael Somers Senior Civil Engineer Construction Management Division Boston Public Works 617-635-3831 Michael.Somers@Boston.gov