Reports (1,911)
-
Contractor Complaints
26 Exeter St, Boston, Ma, 02116Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [TCI Communications, Alpha Masonry] Are the contractors on-site: [Yes] Date when this occurred: [09/10/2025] Please specify details.: [Constituent states that contractor's doing work on Exeter St have a permit for one vehicle, but multiple construction vehicles are present and they are blocking the school zone. Constituent works at Kingsley Montessori School and states the contractors are refusing to move their vehicles from the school zone, creating a dangerous situation for buses to pick up students at the end of the day.]
OPEN #101006282190 -
Contractor Complaints
Intersection Of Sherwood St And Florence St, Roslindale, MaType of Work: [Other] If Other, please specify: [Sidewalk repair and ramp reconstruction] Name of Contractor/Utility working: [Unknown] Please specify details.: [Constituent would like to know when PWD intends to repair and reconstruct the sidewalk ramps in her area. PWD was recently outside marking the sidewalk and constituent wants to act accordingly for the sitaution. Likewise, constituent has a gasline leading from her home into the ground that is taped up on sherwood st that seems like it may be damaged if the work is intense enough and they wanted to flag this issue for pwd]
OPEN #101006278918 -
Contractor Complaints
1 Carmen St, Dorchester, Ma, 02121Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [NotSure] Date when this occurred: [09/06/2025] Time when this occurred: [23:15] Please specify details.: [They are working late hours fixing the sewers. There is lack of pedestrian access and their isn't a police detail.]
OPEN #101006277894 -
Contractor Complaints
23 Hazleton St, Mattapan, Ma, 02126Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Date when this occurred: [09/05/2025] Please specify details.: [sidewalk work was done last week on Hazelton St. Contractors left a gap between the sidewalk and the frontage on multople lots which they filled with gravel. Won't last the winter]
OPEN #101006277811 -
Contractor Complaints
55 Monterey Ave, Mattapan, Ma, 02126Type of Work: [Patch Repair] Name of Contractor/Utility working: [Other] Please specify details.: [PWD patched the road at entrance to the street but the asphalt came back out and now there is a big stone sticking out that nearly hurt the elderly resident at the address]
OPEN #101006276356 -
Contractor Complaints
10 Park St, West Roxbury, Ma, 02132Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [National Grid] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [feeney brothers] Date when this occurred: [06/15/2024] Please specify details.: [const reports over a year ago (june 2024), feeney brothers did utility work for national grid in front of this location and did a poor job repairing the sidewalk. states the previous sidewalk patch repair is now deteriorating and is in need of repair. requesting inspection and repair.]
OPEN #101006274643 -
Contractor Complaints
61 School St, Roxbury, Ma, 02119Type of Work: [Other] Name of Contractor/Utility working: [Other] Are the contractors on-site: [No] Please specify details.: [Rafael Hernandez Shool Parents parking for drop off and pick 8am To 9 amd pickup 2:30 3:30 .Parents park on Walnut Ave there were 10 spots and now only 3.The parents are requsting no more street occupancy permit placed up in this area.White stadium Permit parking for constuction Thank You]
OPEN #101006274364 -
Contractor Complaints
Intersection Of Cummins Hwy And Hyde Park Ave, Roslindale, MaType of Work: [Other] If Other, please specify: [bus lane construction] Name of Contractor/Utility working: [Other] Are the contractors on-site: [Yes] Please specify details.: [The cosntituent states that at this area , they are doing constrcution during rush hour in the morning. It is causing bad traffic that buses are late and children are late for school or missing their bus. The cosntituent states is there any other plans for this construction to change the time of start dso it wont interfere with morning communte. Requesting assistance with this matter.]
OPEN #101006272443 -
Contractor Complaints
39 Everett St, East Boston, Ma, 02128Type of Work: [Other] Name of Contractor/Utility working: [Boston Water Sewer Commission] Please specify details.: [BWSC]
OPEN #101006272132 -
Contractor Complaints
11 Brimmer St, Boston, Ma, 02108Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [National Grid] Are the contractors on-site: [NotSure] Please specify details.: [Const. States National Grid replaced the gas line 4 months ago and dug up the sidewalk, took bricks and piled them onto the walkway of the constituent’s property. The constituent also states work has been completed but the bricks have remained by the constituent’s home. The constituent is requesting assistance with this matter.]
OPEN #101006271493