Reports 233 of 3,168,467 1 filter applied
-
Bridge Maintenance
Intersection Of Meridian St And Condor St, East BostonWhat is the name of the bridge: [Meridian St./Chelsea River: (B-16-019)] What is the nature of the problem: [BPD is reporting an open man hole on the Meridian st bridge. Contacted and reported to Fouad Hamzeh.]
CLOSED · #101003274279Case Resolved. Chelsea PWD handling the issue.
-
Bridge Maintenance
Intersection Of Old Colony Ave And Columbia Rd, South BostonWhat is the nature of the problem: [Columbia Rd Bridge next to this intersection is in need of repair, many cracks and rebar exposed]
CLOSED · #101003201867Case Resolved. Dear Constituent, If you receive a message from the City of Boston regarding an old service request, 311 is currently working on closing out backlogged service requests. We apologize for any confusion or inconvenience. Please contact 311 for further information. Thank you, Boston 311 Team.
-
Bridge Maintenance
Intersection Of Alford St And Rutherford Ave, CharlestownWhat is the name of the bridge: [Alford St./Mystic River: (B-16-029)] What is the nature of the problem: [Lt White of BFD requesting person on site for the Alford St Bridge. Notified Fouad Hamzeh at 4:00AM. Fouad is on his way and Lt White informed.]
CLOSED · #101003142396Case Resolved.
-
Bridge Maintenance
Intersection Of Congress St And Dorchester Ave, BostonWhat is the name of the bridge: [Congress St./Fort Point Channel: (B-16-032)] What is the nature of the problem: [Constituent is reporting a loose fence on the Congress street bridge. It's a temporary fence. Radioed BPW and reported.]
CLOSED · #101002931376Case Resolved.
-
Bridge Maintenance
Intersection Of Chelsea St And Rutherford Ave, CharlestownWhat is the name of the bridge: [North Washington St./Water St.: (B-16-016)] What is the nature of the problem: [Constituent called and reported that there are two metal plates that are located on the North washington st. bridge heading into charlestown that have become seperated. She said that due to this every time a cr drives over it it makes a very loud clanging sound and she can here it over and over again from her apartment. She said that she knows that the bridge is being worked on but wants to know if the two plates can be welded back together to fix the noise issue.]
CLOSED · #101002902179Case Resolved. Dear Constituent, If you receive a message from the City of Boston regarding an old service request, 311 is currently working on closing out backlogged service requests. We apologize for any confusion or inconvenience. Please contact 311 for further information. Thank you, Boston 311 Team.
-
Bridge Maintenance
Intersection Of Terrace St And Gurney St And Tremont St, Mission HillWhat is the nature of the problem: [Bridge near this intersection needs to be patched up. Constituent sees the metal bars of the bridge and it gets filled up with water when it rains]
CLOSED · #101002889797Case Resolved. Dear Constituent, If you receive a message from the City of Boston regarding an old service request, 311 is currently working on closing out backlogged service requests. We apologize for any confusion or inconvenience. Please contact 311 for further information. Thank you, Boston 311 Team.
-
Bridge Maintenance
Intersection Of Milton St And Adams St, DorchesterCLOSED · #101002882410Case Invalid. opened in error.
-
Bridge Maintenance
Intersection Of Hyde Park Ave And Milton St, Hyde ParkWhat is the nature of the problem: [Concrete is broken up and the rods are exposed. I believe it is the father hart bridge but I am not certain.]
CLOSED · #101002882078Case Resolved. Dear Constituent, If you receive a message from the City of Boston regarding an old service request, 311 is currently working on closing out backlogged service requests. We apologize for any confusion or inconvenience. Please contact 311 for further information. Thank you, Boston 311 Team.
-
Bridge Maintenance
Intersection Of New Sudbury St And Congress St, BostonWhat is the nature of the problem: [Not a bridge, but an underpass. The underpass of the Government Center Garage on Merrimac/Congress St, The roof is falling apart, allowing pink insulation to drop onto the cars below. Ongoing where insulation and other debris from the ceiling here are falling through massive holes from the panelling having fallen in the past. Request to conduct a review of the damage and to initiate repair and patchwork on the ceiling of the Roadway underpass.]
CLOSED · #101002878450Case Noted. Please contact inspectional services department.
-
Bridge Maintenance
Intersection Of Nay St And Andrew P Mc Ardle Brg And Meridian St, East BostonWhat is the name of the bridge: [Meridian St./Chelsea River: (B-16-019)] What is the nature of the problem: [911 dispatch is requesting assistance to open the bridge. The current attendant is unable to do so. Contacted listed bridge tender on-call, Fouad Hamzeh, and left VM. BPD is on scene. Radioed BPW for further assistance. BPW responded and will send someone out to open the bridge.]
CLOSED · #101002869362Case Resolved. Situation addressed, and the Drawtender was removed and a new Drawtender is working. The situation is fully resolved. Sorry for the inconvenience. Thank you.
Hold Shift to view as percentage