Reports (6)
-
Roadway Repair
St James Ave & Arlington St to St James Ave & Dartmouth St | Cause of damage: [Utility Work] Type of repair: [Resurfacing] Specify: [Constituent states that lots of utility work has made road very patched, requesting resurfacing]
CLOSED #101005972713Noted. Thank you for bringing this to our attention. St. James Ave and Arlington St. are scheduled for resurfacing this summer. Thank you for your patience and understanding during this process.
-
Roadway Repair
Constituent is requesting for the roadway to be repaved, stating the roadway is very uneven and you can not even walk a walker down it. | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing]
OPEN #101005592709 -
Roadway Repair
Settlement of asphalt caused problem in the roadway | Cause of damage: [Other] Type of repair: [Reconstruction] Specify: [Caller states roadway needs to be re-surfaced, trucks causing a great deal of noise here] Additional Info: [Charles Street South and Park Plaza]
CLOSED #101001222607 -
Roadway Repair
St James Ave between Arlington and Clarendon Sts | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing]
CLOSED #101000925043 -
Roadway Repair
Cause of damage: [Utility Work] Type of repair: [Other] Specify: [web chat: When will the crosswalk to cross Hadassah Way at Park Plaza be repainted? It is completely missing, ever since repaving at this location, susbequent to extensive utility work in several manholes over which the crosswalk passes? requesting crosswalk repainted.]
CLOSED #101000378876 -
Roadway Repair
Man hole cover blew off | Cause of damage: [Other] Type of repair: [Other] Specify: [Make it safe]
CLOSED #101000237918