BOS:311

Help keep our city beautiful.

Boston
  • Tow lot

    The tow lot is only open Monday through Friday, from 7 a.m. - 10:30 p.m. Automated kiosks are available 24 hours a day, seven days a week for vehicle releases. More Information: https://www.boston.gov/departments/transportation/how-get-your-towed-car-back

  • Parking meters

    Parking meters are running on their normal schedules today. More Information: https://www.boston.gov/departments/parking-clerk/how-do-parking-meters-work

  • Street Cleaning

    Daytime street cleaning is canceled. Overnight street cleaning is on a normal schedule. More Information: https://www.boston.gov/departments/public-works/street-sweeping-city

  • Trash and recycling

    Due to the holiday, Friday trash and recycling pickups are delayed one day in some neighborhoods this week. Please check your schedule.

Recent Reports

  • Illegal Parking

    166 W Seventh St, South Boston, Ma, 02127

    Black jeep encroaching into handicapped spot. Difficult to be able to exit and enter handicapped spot. Please ticket and/tow. Thank you

    OPEN #101006719836
  • Domestic Animal Issue

    1754 Columbia Rd, Boston, MA 02127

    Animal neglect. Small black dog chained to bench with no owner or water available.

    OPEN #BCS-00257519
  • Other

    Fairfield St & Marlborough St

    I'm looking for information about a curb replacement project happening in front of my house at 12 Fairfield at the intersection of Fairfield and Marlborough. The project is removing >20 feet of historic brick sidewalk. I was not notified about the project and the crew originally stated they would be replacing "like with like" but then began filling the sections they said would be restored to brick with concrete sidewalk. The first picture is the original curb. The second picture is the curb after an initial concrete pour, when the crew said it the other sections would be restored with brick and that the far low concrete pour near the tree was a base for replacement brick. The final picture is a second pour that happened yesterday, filling in these brick locations with concrete. The crew said "the engineer told us to pour concrete" when asked what had changed since the prior day. I am unable to find any permits or designs. This project is not part of Back Bay or Boston Mobility or "State of Good Repair" projects, according to those offices.

    OPEN #BCS-00257518