- ID
- #101002930157
- Status
- CLOSED
- Opened
- Closed
- Description
- Last fall the concrete sidewalk was remove and path with asphalt until better weather in the spring or summer 2019. That the sidewalk will be redone with concrete. as of today 6/10/2010, no one from the city has come by looked at the issue again.
- Location
-
258 Hebron St, Mattapan, Ma, 02126
42.2710526, -71.1089342
Activity
-
Submitted
Opened
Closed
Case Noted | We have sent an engineer to evaluate and will take care of any immediate public safety hazards. Permanent restoration will be included in a future program when we address upgrades to the area sidewalks. Michael Somers Senior Civil Engineer Construction Management Division Boston Public Works 617-635-3831 Michael.Somers@Boston.gov