CLOSED #101006742113

Case Noted. All pavement markings will be restored following roadway repaving . There is a curing time required for fresh asphalt before markings can be reinstalled .

Opened
5w ago
Closed
4w ago
Description
Cross walks need to be painted again ASAP as road re-surfacing removed them.
Additional Details
Has pole
No
Location
Intersection Of Marion St And Lexington St, East Boston
42.37788954, -71.03708456

Activity

  • Submitted

  • Opened

  • Closed