Description
Unauthorized overnight street excavation and high-decibel cutting by RJV Construction Corp. (BWSC Contract 24-308-001) is actively occurring on Tremont Street between Avery Street and West Street, opposite Boston Common, past 10:00 PM on Wednesday, November 18, 2026—in direct violation of the Boston Public Works Department Winter Moratorium period (November 15 – April 15). For the past seven months, crews have operated directly beneath residential bedroom windows all night through 5:00 AM using cutoff saws, vacuum pumps, and heavy excavation equipment, and they are continuing non-emergency scheduled work past the November 15 moratorium cutoff while failing to replace standard steel road plates with mandatory beige skid-resistant plates.
Location
151 Tremont St, Boston
42.354405, -71.0634285

Activity

  • Submitted

  • Opened