Reports (4,310)
-
Roadway Repair
cONSTITUENT IS CALLING TO REQUEST A RESURFACING/RECONSTRUCTION OF THE ROADWAY DUE TO A POOOR JOB THE LAST TIME IT WAS DONE. | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing] Specify: [CONSTITUENT WANTS THE ROAD TO BE RESURFACED TO IMPROVE THE QUALITY OF LIFE FOR THE CONSTITUENTS IN THE NEIGHBORHOOD.]
OPEN #101005406589 -
Roadway Repair
Constituent states states the entire roadway is uneven, has potholes and the pavement is in poor condition. | Cause of damage: [Normal Deterioration] Type of repair: [Patching]
OPEN #101005406344 -
Roadway Repair
Constituent reported that there are a lot of potholes on Dixwell St. | Type of repair: [Resurfacing] Specify: [Constituent is requesting that the street is resufaced because drivers are having a hard time.]
CLOSED #101005406190Duplicate of Existing Case.
-
Roadway Repair
West st between Austin and Summer | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing]
OPEN #101005404729 -
Roadway Repair
Constituent reports handicapped ramp ws installed on sidewalk. States that asphalt was placed down and drainage in area is now very poor, states there are puddles and flooding when it rain. | Cause of damage: [Other] Type of repair: [Drainage]
CLOSED #101005404584Case Noted. This has been brought to the Engineers attention. It will be addressed when they pave the street.
-
Roadway Repair
Hello, I want to bring to the attention of Boston Public Works & Mayor Wu that Columbus Ave. is one of the worst streets in the city. This is a major connection for cars and bicyclists coming into the city from Roxbury, Jamaica Plain and other neighborhoods west of downtown. I want to know how I can advocate to get this important street resurfaced. any advice would be welcomed. Thanks. | Type of repair: [Resurfacing]
OPEN #101005404483 -
-
Roadway Repair
Inter | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing] Additional Info: [Intersection between E st and F st connecting through tudor st]
OPEN #101005400226 -
Roadway Repair
road needs to be repaved after Eversource work destroyed it | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing]
OPEN #101005388037 -
Roadway Repair
Constituent requests all of Chestnut St is resurfaced. | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing]
OPEN #101005387850