Reports (227)

  • Contractor Complaints

    59 Potomac St, West Roxbury, Ma, 02132

    Type of Work: [Unknown] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [No] Please specify details.: [Const. states BWSC did work over here that resulted in the grass patch on the sidewalk sinking in, requesting repair]

    OPEN #101005526330
  • Contractor Complaints

    5 Degautier Way, Roxbury, Ma, 02119

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [06/20/2024] Time when this occurred: [19:15] Please specify details.: [Constituent states that there is a construction truck blocking a lane of traffic at the address without a street occupany permit.]

    OPEN #101005525490
  • Contractor Complaints

    142 Commercial St, Boston, Ma, 02109

    Type of Work: [Other] If Other, please specify: [sidewalk replace] Name of Contractor/Utility working: [Other] If Other, please specify: [Ciconni & Sons] Date when this occurred: [06/19/2024] Time when this occurred: [13:58] Please specify details.: [they are parking in resident only spots without permits, their permits have expired. They are also double parking and blocking the roadway. They leave their work vehicles there overnight]

    OPEN #101005523461
  • Contractor Complaints

    52 Marion St, East Boston, Ma, 02128

    Type of Work: [Other] If Other, please specify: [Bws] Are the contractors on-site: [No] Date when this occurred: [06/14/2024] Time when this occurred: [08:21] Please specify details.: [Constituent reports Bws did eork across from the street from this address, stating they damaged the sidewalk.Requesting for sidewalk to be fixed]

    OPEN #101005516330
  • Contractor Complaints

    554 E Eighth St, South Boston, Ma, 02127

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [National Grid] Are the contractors on-site: [No] Please specify details.: [Constituetn states an improperly done utility patch put down following National Grid utility work hs causing severe shaking in her home when busses roll over it, also beginning to cause cracks in the founation of her home according to a contractor they had look at it. Previously submitted case #101005504880, would like to know if someone from PWD could reach out to give a rough estimate of the expected timeframe for National Grid to repair the patch.]

    OPEN #101005506894
  • Contractor Complaints

    591 E Sixth St, South Boston, Ma, 02127

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Date when this occurred: [05/24/2024] Time when this occurred: [01:45] Please specify details.: [Constituent reports there is construction work at this location that is causing loud noise.]

    OPEN #101005475802
  • Contractor Complaints

    151 153 Summit St, Hyde Park, Ma, 02136

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [Feeney Bros. for Nat'l Grid] Are the contractors on-site: [No] Date when this occurred: [05/22/2024] Time when this occurred: [15:50] Please specify details.: [last year Feeney Bros excavated for the gas line. Now the excavation has collapsed and is making a sink hole]

    OPEN #101005473784
  • Contractor Complaints

    1906 Centre St, West Roxbury, Ma, 02132

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [PV Barone] Are the contractors on-site: [Yes] Date when this occurred: [05/20/2024] Time when this occurred: [10:57] Please specify details.: [Constituent states there is a company that is completely blocking sidewalk access to his business. Constituent states they are digging up the sidewalk and also have blocked off street access to his driveway. Constituent is requesting someone call him immediately because he has not been able to have customers in all day.]

    OPEN #101005469750
  • Contractor Complaints

    349 Baker St, West Roxbury, Ma, 02132

    Type of Work: [Other] If Other, please specify: [housing] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/16/2024] Time when this occurred: [10:56] Please specify details.: [Constituent states that construction is not yielding to traffic and they are not "following procedures"]

    OPEN #101005465534
  • Contractor Complaints

    90 Westland Ave, Boston, Ma, 02115

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Other] If Other, please specify: [Keash excavating inc] Are the contractors on-site: [Yes] Date when this occurred: [05/11/2024] Time when this occurred: [12:55] Please specify details.: [Constituent reports he was not informed by Keash excavating inc about the work being done today. His building's water was shut off and his business has been negatively affected as a result.]

    OPEN #101005459296

Filters

Search

Status

Ticket Type

  • Contractor Complaints (Remove)