- demo started on monday 29th/ 7/ 13 carbon detectors set off ay ajoining builds/ fire dept. responded, work should notm have been started until a has matt inspection be taken, and removal the proper way , this is a huge safty issue for the neibghoring homes and many residents around the site , this need imediate attention ! | Construction debris: [23 years of wet debris rugs, plaster dead rodants]
- Location
-
9 Cooper St, Boston, Ma, 02113
42.364535, -71.055982