- ID
- #101002417198
- Status
- CLOSED
- Opened
- Closed
- Description
- Reports that the entirety of Carruth street needs to be repaved. Reports that this keeps on being delayed due to construction but would like it to be done. | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing] Specify: [Entirety of street needs repaving] Additional Info: [Gallivan Blvd to Ashmont St.]
- Location
-
52 Carruth St, Dorchester, Ma, 02124
42.28316, -71.06034
Activity
-
Submitted
Opened
Closed
Case Resolved | Construction will start April 23rd, weather permitting. Michael Somers Senior Civil Engineer Construction Management Division Boston Public Works 617-635-3831 Michael.Somers@Boston.gov