ID
#101003343913
Status
CLOSED
Opened
Closed
Description
Probably around 10 months and we've been waiting for this repair. It says Gas. Tell the gas company to get out here and fix it. Our pile of bricks is diminishing daily.
Location
105 Marlborough St, Boston, Ma, 02116
42.35340972, -71.07690669
Photos

Activity

  • Submitted

  • Opened

  • Closed

    Case Resolved | Dear Constituent, All permitteees working in the City of Boston are required to restore any sidewalk disturbed during excavation back to its original material The work must comply with the City's specifications The Boston Public Works Department Construction Inspection Unit (CIU) has identified the sidewalk left in asphalt as belonging to National Grid National Grid has been notified that they must restore the sidewalk patches to brick by August 1st The location has been entered into the CIU data base that tracks repairs to be made by utility companies or private contractors. The CIU inspector will inspect periodically to make sure that the patch holds up until the restoration can be made If the asphalt patch does not meet our standards National Grid will be notified to come back and re do the patch over Sincerely, Mark Cardarelli Supervisor of Utility Coordination and Compliance Boston Public Works Department 617-635-4951 617-635-4951