Other
- Opened
- Description
- Constituent reports the path to the red line going over to orange line coming off from forest hill at the downtown train station it looks as if part of the ceiling is going to fall, is requesting for this to be looked at ASAP. | Case (SR) Type: [MBTA] Referred To: [MBTA]
OPEN
#101004215665
Activity
-
Submitted
Opened