Other

OPEN #101004343787
Opened
Description
Constituent states the tunnel from orange line to red line in the downtown crossing station has a corroding ceiling. Constituent is concerned about safety for commuters and is requesting inspection. | Case (SR) Type: [MBTA] Referred To: [MBTA]

Activity

  • Submitted

  • Opened