CLOSED #101005114865

Case Resolved. Our inspector has addressed this.

Opened
Closed
Description
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [10/17/2023] Time when this occurred: [10:30] Please specify details.: [they have blocked off the sidewalk on both sides of the intersection. people have to walk in the road on a heavily travelled street. Also with the red line shutdown this is the route to Dorchester Ave for the shuttle. No polic or anyone assisting with traffic]

Activity

  • Submitted

  • Opened

  • Closed