CLOSED #101006351723

Noted. Sorry for the inconvenience caused. Please resubmit your complaint to PWD Roadway Repair ARP Resurfacing.

Opened
Closed
Description
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [No] Please specify details.: [Caller states NGRID and BWSC has done alot of work on the street in the last few years and has left the street uneven and with potholes. Caller states this has not been addressed in over a year and would like inspection and for crews to come out to repair. Caller states there are many tourist in the area and more needs to be done to address it.]
Location
Intersection Of Pinckney St And W Cedar St, Boston, Ma
42.35880907, -71.06993073

Activity