- Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Other] If Other, please specify: [PWD] Are the contractors on-site: [Yes] Date when this occurred: [11/28/2025] Time when this occurred: [12:10] Please specify details.: [Constituent states due to construction ongoing on Cummins highway, one way signs were removed from side streets to complete sidewalk repairs. These one ways signs were never reinstalled after repairs. Now there are constantly cars driving the wrong direction causing lots of traffic. Asking to get these signs replaced ASAP.]
- Location
-
Intersection Of Cummins Hwy And Favre St, Mattapan, Ma
42.27050534, -71.10062281