CLOSED #101006398798

Noted. Apologies for the inconveniences this may have caused, inspector will be by to review Utility patches and get them to the appropriate companies to ensure they keep their work to city specifications. Your patience and cooperation is greatly appreciated, thank you.

Opened
Closed
Description
Over the summer, construction crews dug up West 7th Street between D St and E St in South Boston. The repaving job was done very poorly, especially near the intersection of West 7th St and D St. There are multiple raised/uneven sections of pavement, and when buses and larger vehicles drive over them, the impact causes my entire building to shake. The vibrations are strong enough to be felt daily and are worsening over time.
Location
117 117 Aw Seventh St, South Boston, Ma, 02127
42.335845, -71.05347

Activity

  • Submitted

  • Opened

  • Closed