OPEN #101006443669
Opened
Description
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [No] Please specify details.: [const reports there is a large dip in the roadway after bwsc patched over their most recent utility work. states the road is causing cars to veer out of this lane to avoid, requesting inspection and leveling.]

Activity

  • Submitted

  • Opened