- Opened
- Description
- Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [No] Please specify details.: [Constituent states BWSC replaced lead pipes underneath the sidewalk and filled up the spot where the sidewalk was previously with asphalt instead of concrete. Constituent states the concrete is falling apart and makes it very difficult to shovel and maintain during the fall and winter with leaves and snow coverings. Constituent is requesting updates on when the sidewalk will be replaced.]
- Location
-
63 Milton Ave, Dorchester, Ma, 02124
42.28432, -71.07725
OPEN
#101006449095
Activity
-
Submitted
Opened