- Opened
- Description
- I am writing regarding the sidewalk repair work currently taking place in front of my driveway 17 Brahms St Roslindale. During the contractor’s preparation work on Friday, damage occurred to the asphalt portion of my driveway, which was recently installed. I have attached photos showing the damage. At this time, the concrete sidewalk has not yet been poured. However, during the prep work it appears that soil/support material was removed from beneath the edge of the driveway in the area where the damage is now visible. I am hoping the repair and restoration of the damaged driveway asphalt can be included as part of this sidewalk project. Please let me know what the next steps would be or if someone from the project team can inspect the area. Thank you for your attention to this matter, and I appreciate your assistance. Bill Grubbs
- Location
-
17 Brahms St, Roslindale, Ma, 02131
42.277644, -71.139514
OPEN
#101006638788
Activity
-
Submitted
Opened