- Opened
- Description
- Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Date when this occurred: [06/03/2026] Please specify details.: [Caller states there is part of the street that has grooved pavement with no signs at the intersection. Caller states the street is uneven after months of work being done on the street especially along N Beacon st. Caller was riding a bike and got in an accident and hurt himself. caller would like to log a contractor complaint about how the street was left and would like a follow up.]
- Location
-
Intersection Of Leo M Birmingham Pkwy And N Beacon St, Brighton, Ma
42.35826631, -71.15476408
OPEN
#101006686309
Activity
-
Submitted
Opened