- Opened
- Description
- Construction shifting a 2 lane road into 1 lane has been ongoing in Allston by the Shell station at 219 Cambridge St Allston, MA 02134 for nearly 1 year now. I’ve never seen anyone doing work here. Traffic gets backed up all the way to the off ramp and it takes 30+ minutes to get through. I submitted a report about this before and someone who responded stopped about 100 feet shy of where the traffic started that day and told me there was no construction going on and closed my report. When is this expected to be over and why is it still ongoing?
- Location
-
223-233 Cambridge St, Boston, MA 02134
42.35785653, -71.12676782
OPEN
#BCS-00248375