Construction Debris
- Opened
- 1h ago
- Description
- 75 Central Street is doing construction, they’ve been cutting metal exterior railing all around the plaza, leaving metal shavings everywhere, a child is going to cut here. They need to vacuum and sweep it up.
- Location
-
146-150 Milk St, Boston
42.35865468, -71.05325423
OPEN
·
#BCS-00331021
Activity
-
Submitted
Opened