Building Contractor Complaint
- Opened
- 15h ago
- Progression
-
Other submitted as opened as
-
Building Contractor Complaint current
- Description
- UNSAFE CONSTRUCTION - BUILDING INSPECTION REQUEST. 34 Plympton Street, Boston MA 02118. Active renovation and rooftop addition at the top floor unit by DiPierro Construction Inc. Part of the roof is open and covered only by tarps. Rainwater has entered the occupied units below twice, on November 22 and November 26 2026, damaging ceilings and walls and flooding the basement. I personally watched water come through the ceiling during rain on November 26. The contractor stated in writing that the new addition changed roof drainage so water now pools against it and enters the building, and that the roof sags in the middle. No permanent fix is in place and more rain is forecast. Requesting an inspection of weather protection at the open roof, the roof drainage and structural condition, and whether the work matches the approved permit. A related request was also emailed to ISD.
- Location
-
34 Plympton St, Boston
42.33907778, -71.06831667
OPEN
·
#BCS-00403246
Activity
-
Submitted
Opened