Reports (15,215)

  • Contractor Complaints

    36 Prince St, 1, Boston, Ma, 02113

    PWD referring to BTD Enforcement Type of Work: [Unknown] Name of Contractor/Utility working: [Other] If Other, please specify: [New City, LLC] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [OCCU-1848243] Date when this occurred: [06/04/2026] Time when this occurred: [00:42] Please specify details.: [Constituent states dumpster is still on street when the permit expired on 5/27. Asking to please have this removed as parking is limited they should be able to take up 4 spots without paying for them.]

    OPEN #101006687465
  • Contractor Complaints

    1200 Centre St, Roslindale, Ma, 02131

    Type of Work: [Other] Name of Contractor/Utility working: [Other] Are the contractors on-site: [Yes] Please specify details.: [Resident reports tree cutting and the traffic is all backed up.Should be better planning or done at night,Why would Boston give these permits.]

    CLOSED #101006687006

    Resubmitted as BCS-00220407.

  • Contractor Complaints

    Intersection Of Temple Pl And Washington St, Boston, Ma

    Type of Work: [Utility Excavation Work] Please specify details.: [Constituent is upset that there is not a police officer present at this project site to direct traffic.]

    OPEN #101006686714
  • Contractor Complaints

    765 American Legion Hwy, Roslindale, Ma, 02131

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Please specify details.: [Caller states there were crews on American legion highway today 06/03/26 doing work and now there are jersey barriers along the street before walk hill street. Caller would like to know if they are doing work on the bike lane or if it is other work. Requesting an update.]

    OPEN #101006686497
  • Contractor Complaints

    Intersection Of Leo M Birmingham Pkwy And N Beacon St, Brighton, Ma

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Date when this occurred: [06/03/2026] Please specify details.: [Caller states there is part of the street that has grooved pavement with no signs at the intersection. Caller states the street is uneven after months of work being done on the street especially along N Beacon st. Caller was riding a bike and got in an accident and hurt himself. caller would like to log a contractor complaint about how the street was left and would like a follow up.]

    CLOSED #101006686309

    Noted. We kindly ask that you resubmit your complaint to 211, as this location is state-operated.

  • Contractor Complaints

    Intersection Of Public Alley No. 419 And Public Alley No. 420 And Clarendon St, Boston, Ma

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Please specify details.: [Const reported that Public alley 420 was repaved and the contractors told the residents that it would be fine to drive in the area after about an hour. Const stated that it has been about 6 hours but the cones were not yet removed from blocking the Alley]

    OPEN #101006686255
  • Contractor Complaints

    50 Houghton St, Dorchester, Ma, 02122

    Type of Work: [Patch Repair] Name of Contractor/Utility working: [Other] If Other, please specify: [fred Deroma] Please specify details.: [Constituent states sidewalks being done over, signage states from June 2-16 there are no workers and sign states no parking on either side of the street. This is affecting the residents on this street as their driveways are being blocked. With Construction happening all over multiple streets there is nowhere for residents to Park. Requesting if this can be looked into.]

    OPEN #101006686205
  • Contractor Complaints

    127 Homes Ave, Dorchester, Ma, 02122

    Type of Work: [Unknown] Name of Contractor/Utility working: [Other] Are the contractors on-site: [Yes] Please specify details.: [const. reports that the contractors are not blocking off the streets propertly, including the cones not being put out causing her to get tickets. A few days ago her dog was poisoned by something left behind by the contractors. Lastly, the crew left behind nails that caused 2 tires to be punctured.]

    CLOSED #101006685817

    Noted. I’m very sorry to hear about your dog being poisoned. Could you please provide more details about what was left by the contractor? I want to ensure that we address any concerns you may have. Regarding the street, there is no need to block it off for the ongoing work. The police detail on site is allowing residents to come and go freely, so they won’t experience any disruptions. I also want to reassure you that the contractors do not use nails for any of the excavation work they are doing.

  • Contractor Complaints

    Intersection Of Walk Hill St And American Legion Hwy, Roslindale, Ma

    Type of Work: [Other] Name of Contractor/Utility working: [Other] Please specify details.: [Constituent is requesting for signage to be placed in the beginning of the street to let drivers and Bikers know that there is work up ahead, This is a safety concern and very dangerous. Please place signage. ]

    CLOSED #101006685609

    Noted. ?There are several signs alerting motor vehicles ? and bicyclists about the construction ahead. Thank you for bringing it to our attention.

  • Contractor Complaints

    3 Alveston St, Jamaica Plain, Ma, 02130

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Please specify details.: [Const wanted to make a complaint that the permits were posted this after for work starting tomorrow in the area. Const stated that the residents are not happy because they were not given enough notice.]

    OPEN #101006685057

Filters

Status

Ticket Type

  • Contractor Complaints (Remove)