Reports (325)
-
Roadway Repair
Lagrange St from Lasell St to VFW Parkway | Cause of damage: [Utility Work] Type of repair: [Resurfacing] Specify: [Constituent states that 5-6 years ago, the street had work done and only one side of the road was repaved with new asphalt and the other side was not. Constituent is requesting the street be evenly paved as it is causing an uneven road and cracks.]
OPEN #101004524643 -
Roadway Repair
Carlson Cir from Weld St and Church St | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing] Specify: [Constituent states that the road was dug up by BWSC 5 years ago that created multiple large potholes. Constituent states that the potholes have been filled multiple times but that the road conditions continue to get worse, requesting the road be resurfaced.]
OPEN #101004501545 -
Roadway Repair
Constituent reports along water continually collects and ponds whenever it rains, does not go to drains. | Cause of damage: [Other] Type of repair: [Resurfacing]
OPEN #101004477383 -
Roadway Repair
CLOSED #101004477376Resubmitted as 101004477383.
-
Roadway Repair
Everett St from N Beacon St to around 52 Everett St. | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing] Specify: [Constituent reports cracked and uneven roadway, multiple pothole along the road.]
OPEN #101004414742 -
Roadway Repair
Constituent reports half of the roadway was done over and was promised last year it would be done over. States it has been 5 years and nothing has been done. Is requesting for ths to be done asap the roadway is in bad condtion. 101003947941 | Cause of damage: [Other] Type of repair: [Resurfacing]
OPEN #101004378200 -
Roadway Repair
when the city repaired the pot hole it tarred over the cross walk from Florian Hall to the Credit Union. Now no one stops | Cause of damage: [Other] Type of repair: [Other] Specify: [repalace the cross walk]
OPEN #101004376936 -
Roadway Repair
At 52 Eliot on once side of street & 51 Eliot Street on the other side of street. Only one side of the street has been paved after the Utility Co did work on the Street. Now after all the rain/frost the WHOLE street needs to be repaved ASAP!! | Cause of damage: [Utility Work] Type of repair: [Resurfacing]
OPEN #101004277081 -
Roadway Repair
Constituent states the white markers at this location have been knocked down. | Cause of damage: [Other] Type of repair: [Other] Specify: [There are about 4 markers that pedestrians are continuously tripping. Requesting repair for safety reasons.]
CLOSED #101004268417Noted. Flex post at given location have been replaced several times since request was made .
-
Roadway Repair
Curley st. to Walk Hill st. | Cause of damage: [Normal Deterioration] Type of repair: [Resurfacing]
OPEN #101004255705