Reports (1,680)
-
Contractor Complaints
Type of Work: [Other] If Other, please specify: [sidewalk repair] Name of Contractor/Utility working: [Other] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [M Susi and Sons] Date when this occurred: [04/29/2024] Time when this occurred: [12:00] Please specify details.: [during the sidewalk repair the workes damaged the constituents wall]
OPEN #101005449145 -
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [Yes] Date when this occurred: [05/01/2024] Time when this occurred: [14:04] Please specify details.: [Constituent states the plates are continuing to bang and shift as vehicles drive over them .Constituent made a complaint yesterday #5433954 and the contractor has not fixed the plates. Constituent sates there are also porta potties on the plates that move with the plates.]
CLOSED #101005434978Noted. Sorry for the inconvenience. I spoke with GVC at 7am this morning. They're going to do there best to secure the plates better to prevent the noise as much as possible.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [No] Date when this occurred: [04/30/2024] Time when this occurred: [22:51] Please specify details.: [plates are moving and shifting every time a car drives over them waking everybody up]
CLOSED #101005433952Resolved. City Inspectors spoke with Contractor and the contractor will be more diligent with securing roadway plate going forward. Sorry for the inconvenience.
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Please specify details.: [Work happening near this address blocking sidewalk, no sidewalk on other side. Cars have to battle with construction vehicles and pedestrians in the street to get onto Undine. Also there is no police detail present.]
CLOSED #101005431284Noted. Work was put on hold here. The company is posting properly today and continuing with there sidewalk work tomorrow. Sorry for the inconvenience.
-
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [Other] If Other, please specify: [pavement work, patch work and sidewalk] Are the contractors on-site: [NotSure] Date when this occurred: [04/28/2024] Time when this occurred: [13:50] Please specify details.: [The constituent states that hes disappointed with who did the construction work and pavement work in this area.The consitutent states they left it messy and unfinished. The constituent states hes a special offer and affiliated with the city. The constituent states that whoever did the construction in this area should be spoken to. We are trying to keep Boston looking beautiful and this is unacceptable. Requesting assistance with this matter.]
CLOSED #101005430002Noted. Sorry for the inconvenience. This area is going to be resurfaced after the construction is completed.
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Other] Are the contractors on-site: [Yes] Date when this occurred: [04/26/2024] Time when this occurred: [08:58] Please specify details.: [Constituent reports construction work being done for the last three years on street. Constituent would like to know how much longer they have a permit for.]
CLOSED #101005427451Noted. Sorry for the inconvenience. N. Grid has work going on here for a little bit. It is tough to give an exact time frame with different utilities working in and around this neighborhood.
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [NotSure] Date when this occurred: [04/26/2024] Time when this occurred: [00:56] Please specify details.: [Constituent reports there is very loud construction at this location.Constituent reports the construction is unsafe and its very late hours.]
CLOSED #101005427209Resolved. Public utilities work.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [National Grid] Date when this occurred: [04/22/2024] Please specify details.: [Constituent states the crew at national grid was marking up the sidewalk and street was told by the neighbors that it was the wrong area. Constituent states the crew then was rude and only after a manager came to check did they realize that it was the wrong address and went down the road leaving the markings. Constituent would like someone to contact him.]
CLOSED #101005426928Case Referred to External Agency. This complaint will be reviewed P Nagle NatlGrid.
-
Contractor Complaints
CLOSED #101005425280Case Invalid. no e form.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Unknown] Please specify details.: [Constituent states the street was dug up and there are numerous pipes and grates that are exposed and jutting out now the asphalt is done. Constituent states the crews have been gone for a week and not returned and states the streets is dangerous for cars to go down because cars could be damaged. Constituent is requesting the issue be addressed.]
CLOSED #101005425282Resolved. No evidence of pipes nor grates protruding from the ground only raised castings.? The street is being resurfaced? with asphalt.