Reports (70)

  • Park Inspection Program. There is a hole in the PIP next to the 2-5 play structure (it appears perfectly round as if a post was previously there but it is too close to the edge of the pathway to have been a play feature). The rubber surrounding the hole itself is also sagging underfoot. Photo in Notes. | Type of improvement: [Play Equipment] Affiliation type: [Organization]

    OPEN #101005798957
  • Park Inspection Program. Several PIP patches needed, especially in high impact areas (might need some safety tiles in those areas). Photos in Notes. | Type of improvement: [Play Equipment] Affiliation type: [Organization]

    OPEN #101005698983
  • The tennis court playing surface has a lot of cracks and top surface has deteriorated, please resurface the tennis courts at the park and fix the nets. Also if there could be line markings for 4 pickleball courts added after resurfacing just like the recent project completed at the John H tennis courts located at Reservation Rd & Brainard St, Boston, MA 02136. Thank you. | Type of improvement: [Other] SR Type: [Trades General]

    OPEN #101005669698
  • Constituent reports that the right side railing for the steps at the Adams and Winthrop St entrence to the square is unsteady. This rail poses a danger and is unstable for use. Constituent is requesting attention to this as soon as possible, especially before fall rolls around and the square becomes busier. | Type of improvement: [Fencing] SR Type: [Trades General] Inspector notes: [Railing bent beyond repair. Dont have essential equipment to straiten. Need new rail. Pat Toomey]

    OPEN #101005648053
  • Park Improvement Requests

    544 P Massachusetts Ave, Roxbury, Ma, 02118

    Image submitted with report

    Across from 545 mass Ave. Odd side. Coming into the city.

    OPEN #101005632827
  • Park Improvement Requests

    Intersection Of Foster St And Commercial St, Boston, Ma

    Image submitted with report

    No evidence found please remove mattress by mirabella pool

    OPEN #101005621870
  • Park Improvement Program. PIP rubber needs several small to medium patches. Photo in Notes. | Type of improvement: [Play Equipment] Affiliation type: [Organization]

    OPEN #101005613312
  • Park Inspection Program. PIP rubber needs several small repairs throughout, especially around the merry-go-round (Photos in Notes). There is also a "depression" forming at the top of the upper stairs (cushion course has eroded away, creating a trip hazard with the top of the stair when you walk on it and it "caves in" under foot (see Photo in Notes). | Type of improvement: [Play Equipment] Affiliation type: [Organization]

    OPEN #101005591533
  • Constituent states they would like all the trash barrels placed back at the entrances of the park. Constituent states they were removed and wants them back. | Type of improvement: [Other] Affiliation type: [Constituent]

    OPEN #101005582654
  • Constituent reports last winter a tree from rogers park that borders the retaining wall at 470 Washington st fell and damaged the retaining wall. The parks dept removed the tree but the area is now overgrown with weeds. Constituent is requesting that the area gets cleared so that an inspection can be conducted. | Type of improvement: [Other] SR Type: [Fence Repair]

    OPEN #101005535541

Filters

Status

Ticket Type

  • Park Improvement Requests (Remove)