Reports (8,487)

  • Contractor Complaints

    Intersection Of Farwell Ave And Milton Ave, Hyde Park, Ma

    Type of Work: [Unknown] Name of Contractor/Utility working: [Other] Date when this occurred: [05/18/2024] Time when this occurred: [09:30] Please specify details.: [Const. states they are constructing new homes on Kinsale Ln which they do have an off-hours permit to do but they don't see any permit for them to do work in the street and have Milton Ave blocked off. They do have a police detail but const. wanted to make sure everything was permitted.]

    CLOSED #101005467876

    Resolved. No road closure, crew was moving equipment to work site across the street causing temporary blockage…. Permit: Boston Excavation Exca-1589817 expiration 5/21.

  • Contractor Complaints

    39 R Middle St, South Boston, Ma, 02127

    Type of Work: [Utility Excavation Work] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [TMP:Exca-1584726,158473] Date when this occurred: [05/13/2024] Time when this occurred: [15:00] Please specify details.: [Constituent reports that BWSC excavated a water pipe in front of his address then laid down temporary paving asphalt that is too steep for his vehicle to enter his driveway.]

    CLOSED #101005467391

    Noted. Contractors are being contacted to fix berm on water bypass.

  • Contractor Complaints

    39 R Middle St, South Boston, Ma, 02127

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [EXCA- 15D4726] Date when this occurred: [05/17/2024] Please specify details.: [Contractors covered pipe on sidewalk with asphalt, it is raised so high constituent can't get in and out of driveway.]

    CLOSED #101005467377

    Noted. Contractor being contacted to fix berm on water bypass.

  • Contractor Complaints

    28 Walker St, Charlestown, Ma, 02129

    CLOSED #101005466677

    Resolved. What’s the complaint for 28 Walker St, Charlestown?

  • Contractor Complaints

    516 Park St, Dorchester, Ma, 02124

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/17/2024] Time when this occurred: [08:10] Please specify details.: [Constituent states that workers are not wearing proper protective gear, are not posting safe detours for pedestrians or drivers, and are not flagging off dangerous areas on site. Constituent is concerned pedestrians could fall into hole being dug into]

    CLOSED #101005466482

    Resolved. Contractor has created a barrier to control traffic flow, they have also cleared opposite sidewalk for pedestrians to safely walk.

  • Contractor Complaints

    32 Vaughan Ave, Dorchester, Ma, 02121

    Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Verizon] Are the contractors on-site: [No] Date when this occurred: [05/16/2024] Please specify details.: [last year in June a case was submitted for inproper work done around a utility pole. It is still open. The concrete at the base of the pole has deteriorated further and there is something that looks like a rubber glove protruding from the hole. Possibly badly installed insulation,]

    OPEN #101005465545
  • Contractor Complaints

    349 Baker St, West Roxbury, Ma, 02132

    Type of Work: [Other] If Other, please specify: [housing] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/16/2024] Time when this occurred: [10:56] Please specify details.: [Constituent states that construction is not yielding to traffic and they are not "following procedures"]

    OPEN #101005465534
  • Contractor Complaints

    108 Norfolk St, Dorchester, Ma, 02124

    Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [National Grid] Are the contractors on-site: [Yes] Date when this occurred: [05/16/2024] Time when this occurred: [09:20] Please specify details.: [Constituent states that the steel plates near the construction site is shifting, has caused flat tires and is hazardous for residents in the area.]

    CLOSED #101005465405

    Resolved. Notified the contractor they are in route to weld down the plates ?

  • Contractor Complaints

    Intersection Of W Cottage St And Blue Hill Ave, Roxbury, Ma

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/15/2024] Time when this occurred: [13:20] Please specify details.: [Constituent states that construction work is building up a very heavy amount of traffic, existing traffic guidance is not enough.]

    OPEN #101005464456
  • Contractor Complaints

    Intersection Of Boston St And Massachusetts Ave And Columbia Rd, Dorchester, Ma

    Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/15/2024] Time when this occurred: [13:20] Please specify details.: [Constituent states that construction along both roads causes large build of traffic, needs proper road guidance]

    OPEN #101005464448

Filters

Search

Status

Ticket Type

  • Contractor Complaints (Remove)