Reports (8,487)
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Other] Date when this occurred: [05/18/2024] Time when this occurred: [09:30] Please specify details.: [Const. states they are constructing new homes on Kinsale Ln which they do have an off-hours permit to do but they don't see any permit for them to do work in the street and have Milton Ave blocked off. They do have a police detail but const. wanted to make sure everything was permitted.]
CLOSED #101005467876Resolved. No road closure, crew was moving equipment to work site across the street causing temporary blockage…. Permit: Boston Excavation Exca-1589817 expiration 5/21.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [TMP:Exca-1584726,158473] Date when this occurred: [05/13/2024] Time when this occurred: [15:00] Please specify details.: [Constituent reports that BWSC excavated a water pipe in front of his address then laid down temporary paving asphalt that is too steep for his vehicle to enter his driveway.]
CLOSED #101005467391Noted. Contractors are being contacted to fix berm on water bypass.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Boston Water Sewer Commission] Are the contractors on-site: [No] If posted on poles, What is the TMP# on the posting: [EXCA- 15D4726] Date when this occurred: [05/17/2024] Please specify details.: [Contractors covered pipe on sidewalk with asphalt, it is raised so high constituent can't get in and out of driveway.]
CLOSED #101005467377Noted. Contractor being contacted to fix berm on water bypass.
-
Contractor Complaints
CLOSED #101005466677Resolved. What’s the complaint for 28 Walker St, Charlestown?
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/17/2024] Time when this occurred: [08:10] Please specify details.: [Constituent states that workers are not wearing proper protective gear, are not posting safe detours for pedestrians or drivers, and are not flagging off dangerous areas on site. Constituent is concerned pedestrians could fall into hole being dug into]
CLOSED #101005466482Resolved. Contractor has created a barrier to control traffic flow, they have also cleared opposite sidewalk for pedestrians to safely walk.
-
Contractor Complaints
Type of Work: [Utility Excavation Work] Name of Contractor/Utility working: [Verizon] Are the contractors on-site: [No] Date when this occurred: [05/16/2024] Please specify details.: [last year in June a case was submitted for inproper work done around a utility pole. It is still open. The concrete at the base of the pole has deteriorated further and there is something that looks like a rubber glove protruding from the hole. Possibly badly installed insulation,]
OPEN #101005465545 -
Contractor Complaints
Type of Work: [Other] If Other, please specify: [housing] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/16/2024] Time when this occurred: [10:56] Please specify details.: [Constituent states that construction is not yielding to traffic and they are not "following procedures"]
OPEN #101005465534 -
Contractor Complaints
Type of Work: [Resurfacing, Reconstruction Street] Name of Contractor/Utility working: [National Grid] Are the contractors on-site: [Yes] Date when this occurred: [05/16/2024] Time when this occurred: [09:20] Please specify details.: [Constituent states that the steel plates near the construction site is shifting, has caused flat tires and is hazardous for residents in the area.]
CLOSED #101005465405Resolved. Notified the contractor they are in route to weld down the plates ?
-
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/15/2024] Time when this occurred: [13:20] Please specify details.: [Constituent states that construction work is building up a very heavy amount of traffic, existing traffic guidance is not enough.]
OPEN #101005464456 -
Contractor Complaints
Type of Work: [Unknown] Name of Contractor/Utility working: [Unknown] Are the contractors on-site: [Yes] Date when this occurred: [05/15/2024] Time when this occurred: [13:20] Please specify details.: [Constituent states that construction along both roads causes large build of traffic, needs proper road guidance]
OPEN #101005464448