Reports 3,178,770
-
Improper Trash Storage
20 Wardman Rd, Boston
Improper Trash
OPEN · #BCS-00405880 -
Street Light Outage
93 Bellevue St, DorchesterOPEN · #BCS-00405879 -
Improper Trash Storage
387-397 Dudley St, Boston
Overflowing trash dumpsters and also car tire left behind with trash
OPEN · #BCS-00405871 -
Litter & Debris
31 Winchester St, Bay VillageOPEN · #BCS-00405873 -
Street Light Other
3 Lewis St, North EndOPEN · #BCS-00405877 -
Litter & Debris
94-94A Prince St, Boston
trash
OPEN · #BCS-00405861 -
Illegal Parking
1350 Commonwealth Ave, Boston
OPEN · #BCS-00405860 -
Other
820 Cummins Hwy, BostonAll hours, people are soliciting and more on pathway of Bluehill Ave commuter rail, near Cummins Hwy side and not waiting for train
OPEN · #BCS-00405859 -
Illegal Parking
I St & E Sixth St, South BostonOPEN · #BCS-00405863 -
Construction Debris
32A-38 Warren St, Boston
Unsecure construction site skrim blowing into pedestrian walkway
OPEN · #BCS-00405856
Filters
Status
Ticket Type
- Other 587,426
- Illegal Parking 544,308
- Requests for Street Cleaning 250,386
- Pothole 165,053
- Residential Trash out Illegally 161,658
- Streetlights 106,760
- Snow Plowing/Salting 97,380
- Needle Cleanup 84,247
- Tree Maintenance Requests 81,997
- Damaged Sign 79,532
- Broken Sidewalk 76,622
- Dead Animal Pickup 72,023
- Poor Conditions of Property 71,006
- Abandoned Vehicle 66,502
- Graffiti Removal 58,587
- Sidewalk Not Shoveled 58,241
- Rodent Activity 55,160
- Unsatisfactory Living Conditions 51,016
- Empty Litter Basket 31,629
- New Tree Requests 26,236
- Illegal Dumping 24,023
- Tree Emergencies 21,383
- Graffiti Removal 21,361
- Sidewalk Repair 20,891
- Traffic Signal Repair 20,339
- General Lighting Request 17,727
- Residential Trash out Illegally 17,129
- Pest Infestation - Residential 15,991
- Contractor Complaints 15,330
- Park Maintenance Requests 15,205
- Litter & Debris 13,557
- Abandoned Bicycle 13,016
- Highway Maintenance 12,312
- Missing Sign 12,071
- Poor Conditions of Property 10,649
- Illegal Parking 9,387
- Space Savers 9,091
- Streetlight Knock Downs 8,893
- Catchbasin 7,555
- Other Snow Issues 7,473
- Major System Failure 7,284
- Illegal Dumping 7,139
- Roadway Repair 5,652
- Street Light Outage 5,224
- Sidewalk Cover / Manhole 4,453
- Domestic Animal Issue 4,370
- Improper Trash Storage 4,154
- Dead Animal General 4,139
- Illegal Dumping or Disposal 3,853
- Work Hours - Loud Noise Complaints 3,778
- Trash Placed Out Early 3,772
- Overflowing or Unkept Dumpster 3,740
- Missed Waste Pick-up 3,619
- Sidewalk Repair 3,520
- Fire Hydrant 3,150
- Fallen Tree or Branches 3,111
- Pothole 3,026
- Pruning Request 2,994
- Wild Animal Issue 2,991
- Knockdown Replacement 2,965
- Trash on Vacant Lot 2,928
- Overflowing Trash 2,719
- Pavement Marking Maintenance 2,718
- Park Improvement Requests 2,633
- Utility Casting Repair 2,586
- Illegally Blocked Sidewalk 2,357
- Park Groundskeeping 2,333
- Illegal Auto Body Shop 2,267
- Parking on Front/Back Yards (Illegal Parking) 2,204
- Needle Pickup 2,178
- Other 2,026
- Construction Debris 2,019
- Abandoned Building 1,985
- Request for Litter Basket Installation 1,931
- Illegal Graffiti 1,903
- Student Move-in Issues 1,775
- General Traffic Engineering Request 1,675
- Litter Basket Maintenance 1,604
- Broken Park Equipment 1,591
- Illegal Posting of Signs 1,428
- Tree in Park 1,427
- Tree or Stump Removal 1,416
- Parking Meter Repairs 1,306
- Overgrown Weeds 1,274
- Parking on Front/Back Yards (Illegal Parking) 1,167
- Short Term Rental 1,141
- Utility Contractor Complaints 1,138
- Illegal Vending 1,134
- Street Light Other 1,097
- Encampments 1,028
- City/State Snow Issues 1,018
- BWSC Pothole 924
- Construction Debris 851
- Construction Debris 816
- Street Light Knockdown 801
- Traffic Signal Request 744
- Illegal Posting of Signs 702
- Missing / Knocked Down Sign 669
- Fire Department Request 657
- Install New Lighting 638
- Sticker Request 637
- Abandoned Vehicles 634
- External referral 613
- Rat Activity 573
- Unauthorized Signage 560
- Planting Request 538
- Upgrade Existing Lighting 511
- Park Litter & Debris 446
- New / Modified Sign Request 429
- MBTA Request 423
- Parks General Request 403
- Cemetery Maintenance Request 402
- Pigeon Infestation 392
- Downed Wire 386
- Illegal Vending 313
- Ballfield Issue 309
- Roadway Flooding 306
- Lost Pet 300
- Watermain Break 292
- Student Move-In (Trash Collection) 282
- Short Measure - Gas 277
- Park Overflowing Trash Can 274
- Scanning Overcharge 256
- Municipal Parking Lot Complaints 246
- Broken Public Waste Receptacle 245
- Park Light Outage 242
- Unauthorized Vending 241
- Bridge Maintenance 233
- Item Price Missing 196
- Street Light Electrical Safety 173
- Code Enforcement Collection 162
- Install New Signal 148
- Unit Pricing Wrong/Missing 145
- No Price on Gas/Wrong Price 140
- Valet Parking Problems 131
- Request New Markings 126
- Park Dead Animal 125
- Private Parking Lot Complaints 118
- Traffic Signal Knockdown 118
- Pedestrian Safety Issues 113
- Lane Divider 106
- Building Maintenance Violations 103
- Crosswalk Maintenance 98
- Illegal Yard Parking 97
- Park Graffiti 93
- Request New Public Waste Receptacle 69
- Park Suggestions 69
- Product Short Measure 68
- Road Marking Maintenance 65
- Request New Crosswalk 48
- No Building Permit or Violation of Permit 46
- Abandoned Bicycles 43
- Locked Gates 37
- Water in Gas - High Priority 36
- Pest Infestation - Residential 36
- Power Outage 32
- Building Contractor Complaint 30
- Utility Casting Repair 30
- Missing Manhole Cover 28
- Fences/Guardrails/Bollards 27
- Dropped Personal Item 27
- Cemetery Maintenance 26
- Unsanitary Conditions at Establishment 25
- Parking Meter Repairs 24
- Scale Not Visible 22
- Damaged/Faded Sign 16
- Municipal Lots 16
- Bicycle Racks / Bicycle Parking 15
- Unsafe Structure 12
- Bluebikes 12
- Sign Knockdown 8
- Unsatisfactory Living Conditions 7
- Bridge Maintenance 5
- OPC Public Inquiry 4
- Adjoining Property Construction 4
- Oil Truck - Short Measure 4
- Illegal Use and Occupancy of Property 4
- Short Term Rental 3
- PWD General 3
- 00000000-0000-0000-0000-000000000000 2
- Moving Permits 2
- Pothole 2
- Insufficient Heat 2
- ISD Other 2
- Oil Truck - No Price Per Gallon 2
- Emergency Responder Snow Plowing 1
- Illegal Rooming House 1
- Snow Plowing 1
- News Boxes 1
- Unsatisfactory Utilities - (Electrical, Plumbing) - Residential 1
- General Emergency 1
- Overflowing or Un-kept Dumpster 1
- Overcrowding 1
Hold Shift to view as percentage